The Influence of Contractors’ Selection Attributes. A Study of Public Construction Projects Performance in Kenya

  • Harrison Wachira Kiiru The Technical University of Kenya
  • Githae Wanyona, PhD Jomo Kenyatta University of Agriculture and Technology
  • Stephen Diang’a, PhD Jomo Kenyatta University of Agriculture and Technology
  • John Kihoro, PhD The Co-operative University of Kenya
Keywords: Contractor Selection, Public Procurement, Construction Project, Tender Evaluation, Performance
Share Article:

Abstract

This paper evaluated the influence of contractors’ selection attributes on public construction project performance in Kenya. This research contends that an investigation into contractors’ selection attributes at the tender evaluation stage is important to enhance the likelihood of public construction project success performance. The study used a survey method and administered questionnaires to 263 respondents selected through stratified sampling. One hundred and eighty-nine (189) practitioners and professionals in state agencies returned filed questionnaires representing a 71.86% return rate. The literature review and interview reveal thirteen contractor selection variables and six project performance criteria. SPSS was used to analyse the data set obtained for reliability, normality, correlation, and logit regression test. Logit regression analysis reveals the omnibus test of model coefficients converged (Chi-square=26.116, df=13, p=0.016). The model summary reveals Nagelkerke R^2 of 0.246 indicating a relationship of 24.6% between the thirteen predictor variables and project performance indicators. It was found that contractors quoted tender price (Exp (B) = 1.866), innovation (Exp (B) = 2.808), and occupation health and safety (Exp (B) = 0.358) significantly influence the performance of public construction projects when all other contractor's selection variables are controlled. This indicates that the contractor’s quoted tender price, innovation, and occupation health and safety explain well the success of the public construction project from thea six (performance by budget, time, procuring entity satisfaction, environmental sustainability, quality specifications, and fulfilling public need) project performance indicators

Downloads

Download data is not yet available.

References

Aje, O., & Ogunsemi, R. (2006). A model for contractors' selection in Nigeria. Journal of Financial Management of Property and Construction, Vol.11(1), pp.33-43.

Almalmoud, E., & Doloi, K. (2016). Assessment of social sustainability in construction projects using social network analysis. Journal of International Business Research and Marketing, pp. 35-46.

Alzahrani, J., & Emsley, M. (2013). The impact of contractors attributes on construction project success: A post-construction evaluation. International Journal of Project Management, Vol.31(2), pp.313-322.

Aqua, G. (1999). Tenders and Contracts for Building. Edinburgh: Blackwell Science Ltd.

Arifin, W. N. (2018). Calculating the Cronbach's alpha coefficients for measurement scales with "not applicable" option. ResearchGate, pp.1-8.

Arrowsmith, S. (2010). Public procurement regulation: an introduction. Copenhagen: University of Copenhagen.

Atkinson, R. (1999). Project management: cost, time and quality, two best guesses and a phenomenon, it's time to accept other success criteria. International Journal of Project Management, Vol.17(6)., pp.337-342.

Ayettey, A., & Danso, H. (2018). Contractor selection criteria in Ghana construction industry: Benefits and challenges. Journal of Building Construction and Planning Research, pp.278-297.

Benington, J. (2011). 'From private choice to public value?', in J. Benington and M. Moore (eds). Basingstoke: Macmillan.

Brannen, J. (1992). Combining Qualitative and Quantitative Approaches: An overview. Aldershot: Avebury.

Bryman, A. (2012). Social Research Methods, 2nd ed. New York: Oxford University Press.

Cheng, E., & Heng, L. (2004). Contractor selection using the analytic network. Construction Management and Economics, Vol.22, 1021-1032.

Cheng, M., Yeh, S., & Chang, W. (2020). Mult-criteria decision making of contractor selection in mass rapid transit station development using Bayesian fuzzy prospect model. Sustainability, Vol.12(, pp.1-32.

Creswell, W. J. (2014). Research Design Qualitative, Quantitative, and Mixed Methods Research. Oaks: CA, Sage.

Cronbach, J. L. (1951). Coefficient alpha and the internal structure of tests. Psychometrika, Vol.16(3), pp. 297-334.

Ericksson, P. E., & Laan, A. (2007). Procurement effects on trust and control in client-contractor relationships. Engineering, Construction and Architectural Management, pp.527-539.

Eriksson, P. E. (2007). Efficient governance of construction projects through cooperative procurement procedures, Published PhD thesis. Lulea, Sweden: Lulea University of Technology.

GOK. (2012). Printed estimates of development expenditures, 2011/2012. Nairobi: Government Printer.

Guttman, L. (1945). A basis for analysing test-retest reliability. Psychometrika, Vol. 10(4), pp. 255-282.

Hatush, Z., & Skitmore, M. (1997). Evaluating contractor prequalification data: selection criteria and project success factors. Construction Management and Economics, Vol. (15), 129-147.

Holt, G. (1998). Which contractor selection methodology? International Journal of Project Management, Vol.16(3), 153-164.

IEA. (2018). Public Procurement in Kenya. Institute of Economic Affairs.

Ika, L. (2009). Project success as a topic in project management journals. Project Management Journal, pp.6-19.

Kithinji, R., & Kamaara, M. (2017). Factors influencing completion of government road infrastructure projects in Kenya. A case of Meru County. The Strategic Journal of Business & Change Management, Vol.4(42), pp.787-802.

KNBS. (2014). Economic Survey. Nairobi: Kenya Government Printer.

Koskela, L. (2000). An exploration towards a production theory and its application on construction, Unpublished PhD. Thesis. Helsinki: Helsinki University of Technology.

Kumaraswamy, M. M., & Walker, D. T. (1999). 'Multiple Performance Criteria for Evaluating Construction in Procurement Systems-Guide to Best Practice in Construction. London: eds.S.Rowlinson & P.McDemott, E & FN Spon.

Lee, F. (2016). Construction contractor selection criteria: The effects of relational norms, price and prequalification, Unpublished PhD Thesis. White Knights: Henley Business School the University of Reading.

Lim, C., & Mohammed, M. (1999). Criteria of project success: an exploratory re-examination. International Journal of Project Management, Vol.17(4), pp.243-248.

Lynch, J. (2014). Public procurement and contract administration: A brief introduction. Procurement class Room series book 1.

McNabb, D. (2015). Research Methods for Political Science Second Edition Quantitative and Qualitative Approaches. Milton Park, Abingdon: Routledge 2 Park Square, .

Moore, M. H. (1995). Creating public value: Strategic Management in Government. Cambridge: Harvard University Press.

Morris, P., & Hugh, G. (1986). Preconditions of success or failure in major projects. Templeton College: Oxiford centre for Management studies.

Mugenda, A., & Mugenda, O. (2003). Research methods: Quantitative and Qualitative Approach. Nairobi: ACTS Press.

Munano, A. (2012). Preconstruction planning: Exploring the factors that influence timeliness of project completion for public sector buildings in Kenya, Unpublished MSc Thesis. Nairobi: JKUAT.

Mushori, J., Rambo, C. M., & Wafula, C. M. (2019). Influence of management ability of contractors on the performance of road construction infrastructural projects: Beyond project implementation. International Journal of Science and Research, pp.968-975.

Mushori, J., Rambo, C., & Wafula, C. (2020). Evaluating contractor's capacity based on records and performance of road construction infrastructural projects. Journal of Civil Construction and Environmental Engineering, Vol.5(2), pp.20-34.

Ng, T., & Skitmore, M. (1999). Client and consultant perspectives of prequalification criteria. Building and Environment Vol.34, pp.607-621.

NTP. (2022). The budget summary for the fiscal year 2022/2023 and the supporting information. Nairobi: The National Treasury and Planning.

Ntuli, B., & Allopi, D. (2014). Impact of inadequate experience and skill on the construction sector in KwaZulu Natal, South Africa. Engineering Technology & Applied Science Research, Vol.4(1), pp.570-575.

Nunnally, J. C. (1967). Psychometric Theory. New York: McGraw-Hill.

Nyasulu, D. C. (2013). An evaluation of the alignment of the strategic procurement function in city councils and impact on compliance levels with public procurement procedures in Malawi: cases of Blantyre, Lilongwe and Mzulu City Council, Unpublished PhD thesis. Bolton: University of Bolton.

Nyika, D. (2012). An analysis of the causes of failures in the implementation of projects in Kenya. Africa Habitat Review, Vol. 6, pp.379-388.

Ochieng, C. O. (2018). Influence of project risk management strategies on the performance of organisations in the motor industry: A case of Isuzu East Africa Limited Kenya. International Journal of Novel Research in Engineering and Science, Vol.4(2), pp.28-41.

Ofori, G. (2018). Construction in Developing Countries: Need for New Concepts. Journal of Construction in Developing Countries, Vol.23(2), pp.1-6.

Oguya, S., & Muturi, W. (2016). Factors affecting the performance of road construction projects in Arid and Semi-Arid areas in Kenya. International Journal of social sciences and information technology, Vol. II (VII), page 908- 929.

Ogwen, B., Muturi, W., & Rambo, C. (2016). Determinants of timely completion of road construction projects financed by Kenya Roads Board in Kisumu County. International Journal of economics commerce and management, Vol.IV(11), pp. 360-401.

Okowa, N. (2019, September 21). Awarding contracts to lowest bidder is not always the best. Nairobi: The Standard.

Olubunmi, A., Olanipekun, & Xia, P. (2017). Examining the use of theories in construction management research:2005 to 2014. Built Environment Journal, Vol. 14(7), pp.27-28.

Omayo, O., & Gekara, J. (2013). Factors influencing successful completion of road projects in Kenya. International Journal of Arts and Entrepreneurship, Vol.1 (6), pp.26-48.

Ondari, P., & Gekara, M. (2013). Factors influencing successful completion of road projects in Kenya. International Journal of Entrepreneurship, Vol.1 (5), page 1-22.

Radosavljevic, M., & Bennett, J. (2012). Construction Management Strategies: A theory of construction management. Oxford: Wiley-Blackwell.

Rao, M. V., Kumar, V. S., & Kumar, P. R. (2016). Prequalification of contractor in the construction industry using multi-attribute utility theory: A multiplicative approach. Malaysian Journal of Civil Engineering, Vol. 28 (3), pp. 467-480.

Razali, N. M., & Wah, W. B. (2011). Power comparisons of Shapiro-Wilk, Kolmogorov-Smirnov, Lilliefors and Anderson-Darling Tests. Journal of Statistical Modelling and Analysis, Vol.2(1), pp. 21-33.

Runeson, G. (1997). The role of theory in construction management research: comment. Construction Management Economics, Vol. 15, pp.299-302.

Tabuena, A. (2019). Effectiveness of classroom assessment techniques in improving performance of students in music and piano. Global Researcher Journal, Vol.6, pp.68-78.

Tashakkori, A., & Teddlie, C. (1998). Mixed Methodology: Combining Qualitative and Quantitative Approaches. Thousand Oaks: CA: Sage.

Try, D., & Radnor, Z. (2007). Developing an understanding of result-based management through public value theory. International Journal of Public Sector Management, Vol.20(7), Pp.655-673.

United Nations. (2021, July 18). Transforming our world: the 2030 agenda for sustainable development A/RES/70/1. Retrieved from https://sustainabledevelopment.un.org/content/documents/21252030%20Agenda%20for%20Sustainable%20Development%20web.pdf.

Voordijk, H. (2009). Construction management and economics: the epistemology of a multidisciplinary design science. Construction Management and Economics, Vol.27, pp. 713-720.

Wahome, G., Wanyona, G., & Wachira, S. (2013). Public Procurement Oversight Authority Standard Tender Document of Public Building Works in Kenya: A case of Ministry of Public Works managed projects. Africa Habitat Review, Vol. 7, pp.557-563.

Wateridge, J. (1997). How can is/it projects to be measured for success? International Journal of Project Management, Vol.16(1), pp. 59-63.

Watt, D. J., Kayis, B., & Willey, K. (2010). The relative importance of tender evaluation and contractor selection criteria, Vol.28(1). International Journal of Project Management, pp51-60.

Westerveld, E. (2003). The project excellence model: linking success criteria and critical success factors. International Journal of Project Management, Vol. 21, pp.441-418.

Wong, C. (2004). Contractor performance prediction model for the UK construction contractor: Study of logistic regression approach. Construction Engineering Management, Vol.130, pp.691-698.

World Bank. (2014). Implementation status and results Kenya: Kenya transport sector support project. Report No: ISR13712.

Yawei, L., Shouyu, C., & Xiangtian, N. (2005). Fuzzy pattern recognition approach to construction contractor selection. Fuzzy Optimization and Decision Meaking, Vol.4, pp.103-118.

Published
3 July, 2024
How to Cite
Kiiru, H., Wanyona, G., Diang’a, S., & Kihoro, J. (2024). The Influence of Contractors’ Selection Attributes. A Study of Public Construction Projects Performance in Kenya. East African Journal of Business and Economics, 7(1), 295-312. https://doi.org/10.37284/eajbe.7.1.2017