Abstract

Construction projects are widely fraught with conflicts probably as a result of their unpredictability, intricacy, and heterogeneity of players. The management of these conflicts remains ineffective. Empirical evidence from a review of literature has unveiled conflicts to have a detrimental impact on construction projects' performance level, posing a significant barrier to project implementation success, frequently resulting in an increase in project costs, delays in completion, or, in the worst-case scenario, suspension of the project. This study used the measure of the existence or absence of conflicts in under-construction building projects to define the Project harmony aptitude level. This study sought to evaluate into the factors influencing Project Harmony Potential in Construction Projects in Kenya, using a cross-sectional research approach. The cluster technique was used to sample 128 construction building projects registered with NCA in Nairobi within a five-year timespan, which had the embedded unit of analysis under this study. Project developers and financiers, and consultants operating in consultancy or construction firms were randomly sampled and administered with questionnaires. The study utilized inferential statistical analysis of Pearson’s bivariate correlation and regression analysis to identify the significant factors influencing project harmony. The analysis revealed a positive and statistically significant linear relationship between project harmony potential and delay management, partnering orientation of the project team, promptness of Monitoring and Evaluation, direct conflict management provisions in the Project Handbook (PMBOK), the technical experience of the Construction Project Manager (CPM), and communication plan. These parameters were deemed crucial in determining the project harmony potential for Kenyan building projects. These indicators were used to develop a model, which contributed to 69.2% of the project harmony potential. The established model may be used to estimate a project's potential for harmony throughout its execution.

Downloads

Download data is not yet available.

References

Agwu, M. O. (2013). Conflict nanagement and employees performance in Julius Berger Nigeria Plc. Bonny Island. International Journal of Academic Research in Management, 2(4), 125–139.

Bogofanyo, S. & Amakiri, D. (2016). Retrospective view of conflict management: its causes, implications and management strategies in the workplace. European Journal of Research and Reflection in Management Sciences, 4(2), 44–51.

Bryman, A. (2012). Social Research methods (4th Edn). Oxford University Press.

Chigangacha, P. & Haupt, T. (2018). Effectiveness of Client Involvement in Construction Projects. A contractor perspective. 11th Built Environment Conference, 6-8 August 2017, 249–266.

Creswell, J. W. (2009). Research Design: Qualitative, Quantitative and mixed methods approach (3rd Edn). Sage Publishers. https://doi.org/10.1080/14675980902922143

Ejohwomu, A., Oshodi, O., & Onifade, M. (2016). Causes of Conflicts in Construction Projects in Nigeria: Consultant’S and Contractor’S Perspective. Nigerian Journal of Technology, 35(2), 270. https://doi.org/10.4314/njt.v35i2.6

Femi, O. T. (2014). Causes And Effects Of Conflict In The Nigerian Construction Industry. IInternational Journal of Technology Enhancements and Emerging Engineering Research, 2(6), 2347–4289.

Hughes, L. Ginnet, C. & G. J. C. (2009). Leadership: Enhancing the Lessons of Experience (6th edn). McGraw Hill.

Kingsley, E. H. (2015). Managing conflicts in construction of public projects in Ghana: (a case study of selected building project in Ashanti region). Doctoral Thesis, Kwame Nkrumah University of Science and Technology college of arts and built environment.

Leong, T. K., Zakuan, N., Mat Saman, M. Z., Ariff, M. S. M., & Tan, C. S. (2014). Using project performance to measure effectiveness of quality management system maintenance and practices in construction industry. The Scientific World Journal, 2014. https://doi.org/10.1155/2014/591361

Mbatha, S. K. (2021). Causes and Impacts of Conflicts in Construction Projects: A Viewpoint of Kenya Construction Industry. International Journal of Soft Computing and Engineering, 10(5), 1–8. https://doi.org/10.35940/ijsce.d3485.0510521

Mbatha, S. K., Alkizim, A. O., & Mbiti, T. K. (2021). The Practice of Conflict Management in Construction Projects in Kenya. International Journal of Soft Computing and Engineering, 10(4), 6–12. https://doi.org/10.35940/ijsce.d3483.0310421

Mitkus, S. & Mitkus, T. (2014). Causes of Conflicts in a Construction Industry: A Communicational Approach. Procedia - Social and Behavioral Sciences, 110, 777–786. https://doi.org/10.1016/j.sbspro.2013.12.922

Morris, M., Williams, K. Y., Leung, K., Larrick, R., Mendoza, M. T., Bhatnagar, D., Kondo, M., Luo, J., & Jun-chen, H. (1998). Conflict Management Style: Accounting for Cross-National Differences. Journal of International Business Studies, 4(29), 729–747. https://doi.org/https://doi.org/https://doi.org/10.1057/palgrave.jibs.8490050

Mugenda, O. M. & Mugenda, A. G. (2008). Research Methods: Quantitative and Qualitative Approaches. Acts Press Publishers.

Mullins, L. J. (2013). Management and organizational behaviour (10th Edn). Pearson Education.

Newell, M. W. (2008). Preparing For The Project Management Professional (PMP) Certification Exam. (3 rd Edn). AMACOM.

Ntiyakunze, S. K. (2011). Conflicts in Building Projects in Tanzania : Analysis of Causes and Management Approaches. Doctoral Thesis, Royal Institute of Technology.

Okaka, J. . (2019). Model for evaluating performance of construction projects initiated by the Constituencies Development Fund in Kenya: a case study of Siaya County. Doctoral Thesis, Jomo Kenyatta University of Agriculture and Technology.

Puttapalli, A. & Vuram, R. (2012). Discipline: The tool for industrial harmony. International Journal of Multidisciplinary Educational Research, 1(1), 146–151.

Simmons, T. L. & Peterson, R. S. (2000). Task Conflict and Relationship Conflict in Top Management Teams: The Pivotal Role of Intragroup Trust. Journal of Applied Psychology, Vol.85(No.1), 102 – 111.

Simon, S. M. (2021). Views of the Kenyan Construction Industry Players Regarding the Impact of Resource Planning and Leveling on Construction Project Performance. East African Journal of Business and Economics, 3(1), 28–35. https://doi.org/10.37284/eajbe.3.1.286

Soni, S., Pandey, M., & Agrawal, S. (2017). Conflicts and Disputes in Construction Projects: An Overview. International Journal of Engineering Research and Applications, 07(06), 40–42. https://doi.org/10.9790/9622-0706074042

Stickley, D. C. (2002). Project management and dispute resolution in the international petroleum industry. Conference Proceedings CEPMLP.

Vaux, J. S. (2014). Relationship conflict in construction management and how it affects performance and profit. Washington State University.

Vaux, J. S. & Kirk, W. M. (2018). Relationship conflict in construction management: Performance and productivity problem. Journal of Construction Engineering and Management, 144(6), https://doi.org/https://doi.org/10.1061/(ASCE)CO.1943-7862.0001478

Wang, Q., Zuo, W., & Li, Q. (2020). Engineering harmony under multi-constraint objectives : the perspective of meta-analysis. Journal of Civil Engineering and Management, 26(2), 131–146.

Wobodo, C. C. (2019). Conflict management strategies and industrial harmony - a theoretical review of rivers. The Strategic Journal of Business & Change Managemen, 6(2), 981–994.

Yale, D. J. & Hardcastle, C. (2003). The causes of conflicts and Disputes in the Hong Kong Construction Industry – A Transactional Cost Economics Perspective. Reasearch Papers, 4(22).

Published
23 March, 2022
How to Cite
Mbatha, S., Alkizim, A., & Mbiti, T. (2022). An Evaluation into the Factors Influencing Project Harmony Potential in Construction Projects in Kenya. East African Journal of Engineering, 5(1), 87-101. https://doi.org/10.37284/eaje.5.1.590