Assessment of the Causes and Effects of Construction Project Delays in Urban Water Supply Project: A Case Study of Kibremengist and Shakkiso Towns
Abstract
Construction project delays are a widespread challenge, particularly in developing countries like Ethiopia, where they often result in significant time and cost overruns. This study investigates the causes and impacts of construction delays in the Kibremengist-Shakkiso Water Supply Project, a government-funded initiative supported by BADEA. Employing a qualitative, case-based approach, the research draws on project documentation, site observation, and professional insights. The delays were primarily attributed to client-related issues, contractor inefficiencies, consultant shortcomings, and external factors such as power supply and material availability. Key delayed factors included unrealistic time allocation, delayed procurement process, and incomplete design documentation. The study further examines the social and economic consequences of these delays and provides practical recommendations to minimise similar challenges in future water sector projects. The findings provide valuable insights for policymakers, engineers and project managers engaged in infrastructure development in similar countries
Downloads
References
Abebit, H. (2013). Causes and effect of project implementation delay on loan recovery performance (Master’s thesis). Indian Gandhi National Open University.
Abdo A., and Abebe, D. (2007). Assessment of delays in Ethiopian public building executed by local contractors. Journal of Ethiopian Association of Civil Engineers, 4 (3), 1-16.
Abdul-Rahman, H., et al. (2006). Delay mitigation in the Malaysian Construction Industry. Journal of Construction Engineering and Management, 132 (2), 125-133.
Ashwini, A.S., & Rahul, S.P. (2014). Effect of construction delays on project time overrun. International Journal of Research in Engineering and Technology, 3(1), 543-547.
Barbara, J.J. (1989).Construction Management. SYBEX.
Fetene, N. (2009). Causes and effects of cost overrun on public building construction projects in Ethiopia (Master’s thesis). Addis Ababa University.
FIDIC. (1987), Condition of Contract for Works of Civil Engineering Construction (4th ed.).
Owolabi, J.D., Amusan L.M., Oloke C.O., Olusanya, O., Tunji-Olayeni, P., Owolabi, D., Peterjoy, & Omuh, I. (2014). Causes and effects of delay on Project delivery time. International Journal of Education and Research, 2(3), 197- 208.
Ramanathan, C., and Narayanan, S.P. (2014). Qualitative analysis of time delay and cost overrun in multiple design and build projects. In International Conference on Data Mining, Civil and Mechanical Engineering (pp. 93-97).
Salman, A., Seid, M.A. (2003), Construction delay in Florida: An Empirical Study.
Toor, S.U.R., & Ogunlana, S.O. (2008). Problem causing delays in major construction projects in Thailand. Construction Management and Economics, 26(4), 395-408.
Tumi, S. A. H., Omran, A., & Pakir, A.H.K. (2009). Causes of delay in the construction industry in Libya. In Proceedings of the International Conference on Economics and Administration (pp. 265-272). Faculty of Administration and Business, Bucharest.
Williams, T.M., Eden, C.L., Ackermann, F.R., and Tait, A. (1955). The effect of design changes and delays on project costs. Journal of the Operational Research Society, 46(7), 809-818.
Yin, R.K. (2009). Case study research: Design and methods (4th ed.). Sage Publications.
Copyright (c) 2025 Muluken Kefyalew

This work is licensed under a Creative Commons Attribution 4.0 International License.