The construction industry is important in society, the economy and the environment. Despite its importance, it is faced with the challenge of the increasing world's urban population at a rate of 200,000 people per day who require affordable housing, social transportation and utility infrastructure. To counter this challenge, the industry will be under a moral obligation to transform by way of reducing construction costs, improving the use of scarce materials and making more eco-efficient over time. Therefore, this study's objective was to evaluate the effect of the cost of construction of medium-level building projects on project productivity in Kirinyaga County, Kenya. The total costs of construction (cost stack) are split into hard costs, soft costs and unforeseen costs. The methodology adopted for data collection was through the administration of structured questionnaires to select seven categories considered to be the main key stakeholders in the construction of building projects. These comprised landlords/homeowners, architects, structural engineers, quantity surveyors, building contractors, construction project managers, and Ministry of Housing and Infrastructure officials. To analyze the results, descriptive statistics and correlational analysis were used. In the analysis, emphasis was placed on the evaluation of the effect of the cost of construction on project completion time, quality and costs. Results from the study show that key factors affecting project productivity through increased costs are delay in payment to contractors and suppliers, high cost of construction materials and choice of construction materials. Other factors are the level of project complexity, site topography, architectural design errors and changes as well as structural design errors and changes.
##plugins.generic.usageStats.downloads##
Références
Adamu, K.J., Dzasu, W.E., Haruna, A., & Balla, S.K., (2011). Labour Productivity Constraints in the Nigerian Construction Industry. Continental. Journal of Environmental Design and Management, 1(2), 9-13.
Arditi, D., & Mochtar, K. (2000). Trends in Productivity Improvement in the US Construction Industry. Construction Management and Economics, 18(1): 15- 27. https://doi.org/10.1080/014461900370915
Ary, D., Jacobs, L.C., & Sorensen, C. (2010). Introduction to research in education. 8th ed. Wadsworth, USA.
Ashaolu, T.A., & Olaniram, M.O, (2015). Professionalism or Clienteism: An X-ray of Valuation Practice in Southwestern Nigeria. Current Journal of Applied Science and Technology, 521-530
Awad T, Guadiola J, Fraíz D, Sustainable Construction: Improving Construction Productivity through Lean Construction. Sustainability 2021,13, 13877.https://doi.org/10/su132413877
A. Windapo; A. Moghayedi; D. Oliphant; A. Adediran.: Exploring the Components of Cost on Construction Projects. Dept of Construction Economics and Management, University of Cape Town, South Africa. 21st July 2018.
Bless, C., Higson-Smith, C., and Sithole, S.L, Fundamentals of Social Research Methods: An African Perspective (5th Ed). Cape Town, Juta
Boone Jr, H. N., & Boone, D. A. (2012). Analyzing Likert data. The Journal of Extension, 50(2), 48.
Chinthaka Atapatu, Niluka Domingo, Monty Sutrisna, 2022; Causes and Effects of Cost Overruns in Construction Projects. Proceedings of the 45th AUBEA Conference, 23-25 Nov 2022, Western Sydney University, Australia.
Construction cost consultants in London, (2023), The impact of Project Complexity on Cost. https://multiproject.org
Cunningham, T. (2013). Factors affecting the cost of building work-an overview.
Dosumu, O. S., & Aigbavboa, C. O. (2017). Impact of design errors on variation cost of selected building project in Nigeria. Procedia Engineering, 196, 847-856.
Dozzi, SP, Abou Rizk, SM, Productivity in construction. www.nrc.cnrc.gc.ca/irc. Institute for research in construction 1993.
Economic Survey 2021. Kenya National Bureau of Statistics. https://www.knbs.or.ke
Economic Survey 2023: Kenya National Bureau of Statistics. Info@knbs.or.ke
Flyvbjerg, B., Holm, M.S., & Buhl, S. (2002). Underestimating Costs in Public Works Projects: Error or lie? Journal of the American Planning Association, 68(3), 279-295.
Hasan, A., Baroudi, B., Elmualim, A., & Rameezdeen, R. (2018). Factors affecting construction productivity: a 30year systematic review. Engineering, construction and architectural management, 25(7), 916-937.VV
Hu, M., & Skibniewski, M. J. (2021). A review of building construction cost research: Current status, gaps and green buildings. Green Building & Construction Economics, 1-17.
International Monetary Fund.2016. World Economic Outlook: Subdued Demand: Symptoms and Remedies. Washington, October.
Joshi, A., Kale, S., Chandel, S., & Pal, D. K. (2015). Likert scale: Explored and explained. British journal of applied science & technology, 7(4), 396-403.
Kirchberger, M. (2018). ‘‘The role of the construction sector, ’United Nations University World Institute for Development Economics Research. Wider working paper 2018/146. Wider.unu.edu.
Luo, L., He, Q., Jaselskis, E. J., & Xie, J. (2017). Construction project complexity: Research trends and implications. Journal of construction engineering and management, 143(7), 04017019.
Memon, M. A., Ting, H., Cheah, J. H., Thurasamy, R., Chuah, F., & Cham, T. H. (2020). Journal of Applied Structural Equation Modeling.
Ming Hu; Mireslaw Jan Skibniewski. A Review of Building Construction Cost Research: Current Status Gaps and Green Buildings. Green Building and Construction Economics http;//ojs.Wisepup.com/Index.php/GBCE/2021
Mooi, E., Sarstedt, M., & Mooi—Reci, I. (2018). Market Research: The Process Data, and Methods Using Stata. Singapore: Springer
National Construction Authority (NCA), Kenya. (2020). Research on Failure and Collapse of Buildings in Kenya. http://www.nca.go.ke
Nurul Zahirah M.A, N Zainul Abidini, Azlan Raofuddini Nuruddini: Soft Costs that Affect Developers Decision to Build Green. International Journal of Civil & Environmental Engineering Vol: 7, No: 10, 2013.
Raetz, H., Forscher, T., Kneebone, E., & Reid, C. (2020). A Terner Center Report-March 2020.
Saiz, A. (2023). The global housing affordability crisis: Policy options and strategies. MIT Center for Real Estate Research Paper, (23/01).
Sediqi, Sayed. (2022). Re: What Does a Higher Mean Indicate in Spss? Retrieved from, https://www.researchgate.net/post
Sihle Mbekushe and Christopher Amoah, 2022. The Effect of Unskilled Labourers on the Construction Productivity. Proceedings of the Construction Business and Project Management Conference. 24-25 June 2021. University of Cape Town, South Africa.
Shamil Naoum, Fereydoun Dejahang, Daniel Fong, David Jaggar, A new Framework for determining productivity factors on construction sites. https://www.researchgate.net/publication,/ 270799833. 2009
Xie, W., Deng, B., Yin, Y., Lv, X., & Deng, Z. (2022). Critical factors influencing cost overrun in construction projects: A fuzzy synthetic evaluation. Buildings, 12(11), 2028.
Copyright (c) 2025 James Mithamo Muthike, Christopher Luchebeleli Kanali, PhD, Abednego Oswald Gwaya, PhD