The practice of menial farming in the southwestern part of Nigeria have necessitated the need for the blacksmith industry to produce farm implements for the need of their immediate environment (farmers). With increased cost and time of production, coupled with demand size, reduced productivity and in order to meet the customer’s schedule, the study was conceived to evaluate the standard time to start and finish a product to manage production time and to estimate the optimum production capacity of the blacksmith workstation. After a careful survey of the local blacksmiths and with the aid of a stopwatch and study time chart, standard time was evaluated for harvester, digger and axe. These implements are the most commonly used items by the locals. The standard time for the local blacksmith’s axe, digger and harvester production was estimated to be 1458.35, 1931.44 and 936.66 Seconds respectively. It can therefore be concluded that the blacksmiths working for 8 hours a day will produce either (i) about 20 units of axe per day, (ii) 15 units of digger per day, or (iii) 31 units of harvester per day, or (iv) 7 units each, of the products per day

Downloads

Download data is not yet available.

References

Agu, S.S., & Ali, V.E. (2012). The role of art objects in technological development of Nigeria: An archaeological perspective. Bassey Andah Journal, 5, 201-214.

Apoorva, M.V., & Ram, M.M. (2016). Time study analysis of loading and unloading of component from a CNC fixture. International Journal of Technical Research and Applications, 4(3), 239-243.

Arkundato, A., Misto, M., Paramu, H., Jatisukamto, G., & Sugihartono, I. (2019). Heating and quenching procedure on the making of traditional blacksmith steel with high quality. Spektra: Jurnal Fisika dan Aplikasinya, 4(1), 39-50.

Aro, G. C. Chidume, C.G., Enwo–Irem, I.N., Eze, O.C., Nwankwo, F.M., & Oko-Out, C.N. (2021). Warfare in pre-colonial Africa: An examination of the role of African blacksmiths. Trames Journal of the Humanities and Social Sciences, 25 (75/70), 1, 69-82.

Bon, A.T., & Daim, D. (2010). Time motion study in determination of time-standard in manpower process. Proceedings of EnCon2010, 3rd Engineering Conference on Advancement in Mechanical and Manufacturing for Sustainable Environment, Kuching, Sarawak, Malaysia, 14-16.

BukarNgawaitu, M., Umar, Z., & Gujja, A. (2022). Assessment of local blacksmithing industry in Maiduguri, Borno State Nigeria. International Journal of Information, Engineering & Technology, 11(7), 47-54.

Chidiebere, O. (2017). Origin of iron technology in Africa: The Abiriba blacksmithing in Focus. in Pyrex Journal of History and Culture, 2(1)

Elnekave, M. & Gilad, I. (2006). Rapid video-based analysis system for advanced work measurement, International Journal of Production Research, 44(2), 271–290.

Ezenagu, N. (2014). The blight of African indigenous technology in the 21stcentury: The way forward. Journal of Tourism and Heritage Studies, 3(1), 59-73.

Hartanti, L.P.S. (2016). Work measurement approach to determine standard time in assembly line. Proceedings of 31st IASTEM International Conference, Pattaya, Thailand, 23rd -24th August 2016, 49-52.

Hassanali, K.N. (2011). A Productivity model utilising a work study approach for performance measurement, The Journal of the Association of Professional Engineers of Trinidad and Tobago, 40(1), 13-25.

Kaydos, W. (1991). Measuring, managing, and maximizing performance. Productivity Press, Atlanta, GA,

Kulkarni, P.P., Kshire, S.S., & Chandratre, K.V. (2014). Productivity improvement through lean deployment and work study methods. International Journal of Research in Engineering and Technology, 3(2), 429-434.

Li, W., Yang, Y., & Yuan, D. (2015). Reliability assurance of big data in the cloud: cost effective data transfer for data creation and data recovery, ScienceDirect, Elsevier, 65-78,

Nur, N.M., MD Dawal, S.Z., & Dahari, M. (2015). The relationship between work productivity and acute responses at different levels of production standard times. International Journal of Industrial Ergonomics, 56, 59-68.

Nur, N.M., MD Dawal, S.Z., Dahari, M., & Sanusi, J. (2016). The effect of energy expenditure rate on work productivity performance at different levels of production standard time. Journal of Industrial of Physical Therapy Science, 27, 2431-2433.

Oloidi, F.J. (2021) Traditional economy in Nigeria before colonial administration. Webology, 18(6), 3176-3185.

Raji, A.O.Y., Olumoh, A.O., & Abejide, S.T. (2013). Women and their role in the economy of pre-colonial Ilorin, northern Nigeria. Arabian Journal of Business and Management Review, 3(5), 43-54.

Roberts, A.F., & Berns, M.C. (2018). Striking Iron: The art of African blacksmiths, African Arts, (51), 66-85.

Sanjay, P., & NandKumar, H. Industrial engineering and production and operations management (4th ed.). Electro Tech Publication, Satara.

Sreekumar, M.D., Chhabra, M., & Yadav, R. (2018). Productivity in manufacturing industries. International Journal of Innovation Science and Research Technology, 3(10), 634-639.

Taifa, I.W.R., & Vhora, T.N. (2019). Cycle time reduction for productivity improvement in the manufacturing industry. Journal of Industrial Engineering and Management Studies, 6(2), 147-164,

Tapasco-Alzate, O.A., Giraldo-Garcia, J.A., & Osorio-Garcia, D. (2020). Work productivity management in knowledge-intensive service companies: consideration and challenges. Journal of Management, (36)66, 64-77.

Turner, W.C., Mize, J.H., & Case, K. (1993). Introduction to Industrial and Systems Engineering. Prentce-Hall Inc., Englewood Cliffs, New Jersey.

Wiyaratn, W., & Watanapa, A., (2010). Improvement plant layout using systematic layout planning (SLP) for increased productivity. World Academy of Science, Engineering and Technology 4, no. 12, pp. 1382-1386,

Published
14 August, 2024
How to Cite
Abiola, O., & Oke, A. (2024). Evaluation of Standard Times for Some Local Blacksmith’s Products. East African Journal of Engineering, 7(1), 237-246. https://doi.org/10.37284/eaje.7.1.2108